Thursday, November 11, 2010

CrazyEngineers Forum - Electrical & Electronics Engineering

CrazyEngineers Forum - Electrical & Electronics Engineering


Flexiforce Drive Circuit

Posted: 10 Nov 2010 07:25 PM PST

Attached is the Flexiforce drive circuit. I would like to ask whether I can improve improve the performance of Flexiforce in term of linearity, hysteresis, repeatability, or whatsoever other parameter by change the drive circuit to Wheatstone bridge or instrumentation amplifier?

load forecasting

Posted: 10 Nov 2010 07:58 AM PST

pls give me notes related to load forecasting for exam. please help me friends

transformer differential operation

Posted: 10 Nov 2010 07:49 AM PST

hello,

please give me possible reasons for 'transformer differential operation' in power plant as it trips the plant.

i'm working in 12 mw power plant.

thanks

Building Load Shedding

Posted: 10 Nov 2010 03:32 AM PST

Hello CE'ers,

We have a building where the power trips whenever the load exceeds 400 amps. I have been asked to create a scheduel to shed some of the loads within the building whenever the power consumption reaches a certain load, so that the power never trips within the building.

I am very unsure where to start and do not really know of power phases etc. I have a list with all the equipment , it's phase, KW, AMPS and the assumed max current per phase. How would I go about the create a scheduel? The building has a BMS system which would control this.

Regards,
LEon