CrazyEngineers Forum - Electrical & Electronics Engineering |
Posted: 10 Nov 2010 07:25 PM PST Attached is the Flexiforce drive circuit. I would like to ask whether I can improve improve the performance of Flexiforce in term of linearity, hysteresis, repeatability, or whatsoever other parameter by change the drive circuit to Wheatstone bridge or instrumentation amplifier? |
Posted: 10 Nov 2010 07:58 AM PST pls give me notes related to load forecasting for exam. please help me friends |
transformer differential operation Posted: 10 Nov 2010 07:49 AM PST hello, please give me possible reasons for 'transformer differential operation' in power plant as it trips the plant. i'm working in 12 mw power plant. thanks |
Posted: 10 Nov 2010 03:32 AM PST Hello CE'ers, We have a building where the power trips whenever the load exceeds 400 amps. I have been asked to create a scheduel to shed some of the loads within the building whenever the power consumption reaches a certain load, so that the power never trips within the building. I am very unsure where to start and do not really know of power phases etc. I have a list with all the equipment , it's phase, KW, AMPS and the assumed max current per phase. How would I go about the create a scheduel? The building has a BMS system which would control this. Regards, LEon |
You are subscribed to email updates from CrazyEngineers Forum - Electrical & Electronics Engineering To stop receiving these emails, you may unsubscribe now. | Email delivery powered by Google |
Google Inc., 20 West Kinzie, Chicago IL USA 60610 |
No comments:
Post a Comment